Seeking a challenging position in progressive organization where I can have sense of quality competition, achievement and recognition and to serve the organization with my utmost desire.
Compressors
• Duel intake Multistage centrifugal compressor for refrigeration
1500 KW.
For refrigeration.
Working Fluid is Propane.
Multistage centrifugal compressor
280 KW.
For vacuum filtration.
Working Fluid is Inert Gas (CH4).
Oil flooded screw compressor
For refrigeration.
Working Fluid is Propane.
P.D Compressor
Single stage double acting.
For vacuum striping.
Propane De-asphalting Unit (Design Capacity 3200 BPSD )
This includes:
Extractor (Propane is using as solvent in extractor).
Box type Natural Drought Fire Heater.
Stripers and Fractionating columns For Propane recovery.
Furfural Extraction Unit (Design Capacity 3700 BPSD )
This includes:
Extractor (Is a Rotating Disk Column).
Box type Natural Drought Fire Heater.
Vacuum Striping and Fractionating columns For Solvent Recovery.
Methyl Ethyl Kenton Dew axing Unit (Design Capacity 3400 BPSD )
This includes:
Dill chill Crystallizer For Crystallization.
Rotary Filter and Multistage centrifugal Compressor for Vacuum filtration.
Triple effect evaporation for solvent recovery and striping.
Box type Natural Drought Fire Heater.
305 HPU(HYDROGEN PRODUCTION UNIT) ERECTION AND COMMISSIONING
PREPARATION FOR INITIAL START-UP
PLANT PREPARATION
This includes:
PRESSURE TEST
Purging and Blast purging
PLANT INSPECTION- CHECK-OUT
Vessels ,Exchangers ,Filters Reactors ,piping, Instrumentation
Fans, Pump& compressors , Reformer(FURNACE) , Electric motors
CLEANING OF LINES AND EQUIPMENT
CLEANING METHODS
Water Flushing
Air Blowing
Steam blowing
Mill Seal remove
Steam spalling
AUXILIARY SERVICE COMMISSIONING
The utility systems should be test and put into service as soon as allowed by the construction schedule, in
Order to have utilities available for plant pre-commissioning & commissioning.
STEAM
SERV
To discharge duties & responsibility as assigned to him by head of Department or immediate time to time, either verbally or in writhing control all activities Q.C lab.
Assure all Quality reports & standard Operating procedure (SOPs) are applying during work.
Disuses all quality parameters to management as per international standard our buyer Requirements.
Make sure that all SOPs are well performed in good working
Operate All Machines in Company.