خلاصہ


Project Engineer


پراجیکٹس

GSK

تجربہ

کمپنی کا لوگو
Project engineer
Horizon Engineer
اپریل ۲۰۲۰ - موجودہ | Karachi, Pakistan


کمپنی کا لوگو
Worked as a HVAC Engineer
GSK pharma jamshoro
اکتوبر ۲۰۱۹ - مارچ ۲۰۲۰ | Karachi, Pakistan


HVAC: (Heating ventilation air conditioning): Experienced in central plant, Packageunits. Split units, window air conditioners installation works, also comprising planning, scheduling, coordinating with main clients, contactors, interacting with consultants, Equipment selection, Duct fabrication according to (ASHRAE, SMACNA, DW 144/ 142).
Chilled water Pipe installation, Workshop Drawings & Material Submittal preparation, Materials & Fittings take off and Execution.

Installation, Testing & commissioning of Air Handling Units, Dehumidifiers, Humidifiers, Dust collectors, Fan Coil Units, ventilation fans, Chilled water pumps installations.

Compressed Air System: Installation, operation and maintenance of complete compressed air system, including Air dryers, air receivers, filters, air traps. Air control system. Validation and commissioning of compressed air system including URS, DQ, IQ, OQ and PQ.
 
Purified water System (R.O&D.I system): Installation, operation and maintenance of Purified water system, filtration system of Purified water. Validation and commissioning of water system including URS, DQ, IQ, OQ, and PQ.

Plumbing: (water supply, Drainage and storm water) Workshop drawings and material submittal preparation, water heaters and sanitary items selection. Material fittings and valve quantity take off (Inventory ordering and control) execution, testing and commissioning of supply pipe line, drainage pipe line. Storm water pipe line, water tank, water heater, transfer pumps,

Fire Fighting: (Sprinkler system, Hose Reel system) Installation, Testing & commissioning of M.S Pipe line, Sprinkler, Hose Reel, Dry Risers, Wet risers, Foam system, Halogenated extinguishing Agent system and Fire pumps(Diesel pump, jockey pump and electric motor pumps) as per civil defense regulations and standards. Know how about FM 200 Fire suppression system and Interim fire suppression system.
 
Electrical system: Installation of electrical system which comprises of following:

Lying of main power Cables, Installation of DBs, PDBs LV and HT panels.


Supervision of CCTV, Door access, Door interlocking system, Public addresses System, Fire alarm system installation work.

Building Management System: Responsible for the operations & Maintenance of BMS systems. Responsible for execute the Validation of BMS Systems as per schedules.

Monitoring & controlling the process area environmental conditions (Like Temp, RH & DP) as per client requirement.

Trouble shooting of BMS components (Like DDC, Actuators, DPT, etc) Analyzing and understanding the different types of Requirement Specification. Controlling and monitoring fire alarm systems and resolving issues. Generating reports and trends as per client requirement.

Good control of internal comfort conditions.

Effective monitoring and targeting of energy consumption.

Maintaining of VFDs and DDC panels.

Improved plant reliability and life.

EHS compliance and Process Safety:

Process safety control & compliance. Site permits to work compliance, lock out tag out procedure compliance. Zero access guarding machinery safety, Zero accident Promotion emissions control, Site energy management water stewardship, Waste Management System. Team leader for energy management system

کمپنی کا لوگو
Worked as a Project Lead Engineer
Shahnawaz engineering
مئی ۲۰۱۸ - ستمبر ۲۰۱۹ | Karachi, Pakistan


PROJECTS:
GSK Pharma Jamshoro Hyderabad:
Syrup Block project:
 Installation of HVAC System which comprises of following equipment:
Air Handling Units 06 nos.
Exhaust Air Fans 04 nos.
Ventilation Fans 02 nos.
Fan Coil Units 02 nos.
Installation of steam operated Heat exchanger (shell and Tube type) with auto control actuator and control with BMS system.
Chilled water piping for above AHUs, Heat exchanger and connection with existing Header of Pumps.
Installation of BMS valves two-way, three-way, thermos wells for sensors.
Installation G.I metal medium pressure flange type ducting 4”WC test pressure complete in all respects.
Installation of Fiber glass insulation with vapors barrier, cloth jacketing with anti-fungus painting.
Installation of 2” thick fiber glass rigid board thermal insulation make kimmco with G.I sheet metal cladding.
Installation of air devices including connections with air ducts i.e.
Supply air diffuser, supply air register T&B type.
Exhaust air register, Return air grills low pickup.
Installation of washable synthetic filters as per SMACNA standards.
Installation of Bank Type HEPA H-13 filters, F-6filters, F-7filters, G-4 panel filters.
Exhaust air louvers, Fresh air Intake filters, Fire dampers, Volume control dampers.
Installation of Constant Air Volume Regulators for supply and return air ducts.
Installation of Air flow stations in all air Handling Units for monitoring of air flow, air temperature for BMS System.
Installation of black carbon schedule 40 steel piping for chilled water supply and return system with pressure testing and with pre-molded fiber glass pipe insulation.
Installation of valves and specialties (chilled water services) Make Econosto
Gate valve, Combination Flow Regulating Valve with flow measuring nipples, Y-Type strainers chilled water. Ball valves, Auto air vents.
Installation of G.I water supply piping for makeup and drain system with Aero flexes insulation.
Installation of Motor Control Centers (MCCs) weather proof construction (MCC1, MCC2, MCC3.
Electrical wiring of all HVAC equipmente earthling and connection with MCCs.
 Installation of Pressure gauges, Temperature gauges, Thermometers, Magnehellic gauges, Duct mounted dial type temperature indicators.
Installation of tags and color coding/stenciling of whole HVAC System.
Air Balancing, Water balancing and D.O.P (Dust oil particle) testing Of the HEPA Terminal filters. Aerosol generator.
Preparation of as installed drawings (As built drawings).
Testing, start up, Commissioning, balancing, adjusting and handing over of complete system as specifications.
GSK Pharma Jamshoro Hyderabad:
INSTALLATION NEW CHILLER PROJECT:
Installation of complete chilled water supply and return piping for both Absorption chillers
550ton
Installation of condenser water supply returns piping for both chillers and both cooling towers.
Installation of centrifugal chilled water pumps three No H 130 FT 720 GPM.
Installation of centrifugal condenser water pumps four No H 93 FT 1583 US GPM.
Installation of Cabinet type cooling tower three cells 1320 US GPM capacity with complete auto control system.
Installation of all valves and fittings that are:
Sluice valve, Strainers, Balancing valves, Check valves, Flexible connectors (Bellows). Ball Valves, pressure gauges, Thermometers.
Installation of Chemical by pass feeder for chilled water system and automatic chemical dosing pump for condenser water system with automatic bleed off valves.
Installation of pressurized Expansion tank for auto make up of chilled water circuit.
Installation of Flow Meters for Makeup of cooling tower and make up of chilled water system

کمپنی کا لوگو
Worked as a HVAC (Maintenance Engineer)
Gsk Jamshoro
نومبر ۲۰۱٦ - مئی ۲۰۱۸ | Jamshoro, Pakistan


(A) HVAC: (Heating ventilation air conditioning): Experienced in central plant, Packageunits. Split units, window air conditioners installation works, also comprising planning, scheduling, coordinating with main clients, contactors, interacting with consultants, Equipment selection, Duct fabrication according to (ASHRAE, SMACNA, DW 144/ 142).
Chilled water Pipe installation, Workshop Drawings & Material Submittal preparation, Materials & Fittings take off and Execution.
Installation, Testing & commissioning of Air Handling Units, Dehumidifiers, Humidifiers, Dust collectors, Fan Coil Units, ventilation fans, Chilled water pumps installations.
(B) Compressed Air System: Installation, operation and maintenance of complete compressed air system, including Air dryers, air receivers, filters, air traps. Air control system. Validation and commissioning of compressed air system including URS, DQ, IQ, OQ and PQ.
(C) Purified water System (R.O&D.I system): Installation, operation and maintenance of Purified water system, filtration system of Purified water. Validation and commissioning of water system including URS, DQ, IQ, OQ, and PQ.
(D) Plumbing: (water supply, Drainage and storm water) Workshop drawings and material submittal preparation, water heaters and sanitary items selection. Material fittings and valve quantity take off (Inventory ordering and control) execution, testing and commissioning of supply pipe line, drainage pipe line. Storm water pipe line, water tank, water heater, transfer pumps,
(E) Fire Fighting: (Sprinkler system, Hose Reel system) Installation, Testing & commissioning of M.S Pipe line, Sprinkler, Hose Reel, Dry Risers, Wet risers, Foam system, Halogenated extinguishing Agent system and Fire pumps(Diesel pump, jockey pump and electric motor pumps) as per civil defense regulations and standards. Know how about FM 200 Fire suppression system and Interim fire suppression system.
(F) Electrical system: Installation of electrical system which comprises of following:
Lying of main power Cables, Installation of DBs, PDBs LV and HT panels.
Supervision of CCTV, Door access, Door interlocking system, Public addresses System, Fire alarm system installation work.
(G) Building Management System: Responsible for the operations & Maintenance of BMS systems. Responsible for execute the Validation of BMS Systems as per schedules.
Monitoring & controlling the process area environmental conditions (Like Temp, RH & DP) as per client requirement.
Trouble shooting of BMS components (Like DDC, Actuators, DPT, etc) Analyzing and understanding the different types of Requirement Specification. Controlling and monitoring fire alarm systems and resolving issues. Generating reports and trends as per client requirement.
Good control of internal comfort conditions.
Effective monitoring and targeting of energy consumption.
Maintaining of VFDs and DDC panels.
Improved plant reliability and life.
(G) EHS compliance and Process Safety:
Process safety control & compliance. Site permits to work compliance, lock out tag out procedure compliance. Zero access guarding machinery safety, Zero accident Promotion emissions control, Site energy management water stewardship, Waste Management System. Team leader for energy management system.

کمپنی کا لوگو
Worked as a Site Engineer (Mechanical)
DINSONS construction & Engineers
مارچ ۲۰۱۳ - اکتوبر ۲۰۱٦ | Karachi, Pakistan


To Maintain HVAC System including Air handling units ,De-humidifiers, Exhaust air fan, ventilation air fan, dust collectors, Air compressors, desiccant Air Dryer, And R.O Plant.
In Compliance with Current GEP, GMP, HSE Guidelines and GSK Corporate citizenship.
Coordinate with consultant on reviews for shop drawings, MEP related designs, HVAC, Fire Alarm Fighting & provide solution options. Prepare feasibility studies, basis of design, engineering alternative solutions and cost analysis reports.Prepare concept base, schematic and detail design and drawings for HVAC system.
Prepare project technical specifications and BOQ of the project.
Central Utility plants and Mechanical room equipment design sizing and selection.
 Assist the section manager as directed and supervise engineers & CAD team.
Review QMS processes, identify potential risks and establish controls.
Have skills of problem solving, team working, good communicator, adaptability and flexibility, IT skills, self-motivation.
Assist in MEP, HVAC Fire Alarm & Fire Fighting submittals comments the submittals.
Review installation of MEP, HVAC, Fire Alarm Fighting works
Provide cost estimate support for maintenance projects.
Review drawings submitted by main contractor & verify bill of quantities
Test& assist commissioning of MEP HVAC equipment.
Team player with multi-tasking skills.
Excellent written & verbal communication skills in English.
 Ensure MEP HVAC Subcontractors adhere with relevant Quality records regulations including
safety. Soil & Waste system using PPR/PP pipes and UPVC pipes.
 Central Firefighting, Fire hose cabinet’s installation.
Assisting General Manager in the Project Work from the beginning stage till the submission.
 Preparation of Bill of Quantities and floating the enquiries to the venders.
 Mobilization of man power for execution of the project.
Preparation of Workshop Drawing and Material submittal for consultant approval.
Preparation of Daily & Weekly program based on one month look Ahead program.
 Supervision of installation of HVAC, Plumbing & Firefighting items as per standards.
 Floating Request for Inspection of installations to Consultant and rectifying if any snag works comments.
Floating request to consultant for material inspection as per submittals and specification.
Coordination with all other services like Architectural & Electrical etc. towards successful completion of project.
Attending the weekly site meeting with consultant and sub-contractors.
Preparation of appropriate documents for handing over the Project.
Cost Estimation of the whole project using excels.
Prepare the detailed site quantities requirements based on consultant drawings.
 Preparation of shop drawings and submit to consultant for approval.
 Supervision of duct fabrication as per DW142/SMACNA standards and its installation.
Supervision of installation of HVAC, Plumbing, Electrical and Firefighting items as per standards
norms.

کمپنی کا لوگو
tranee
novties pharma company jamshoro
دسمبر ۲۰۰۱ - دسمبر ۲۰۰۱ | Jamshoro, Pakistan

تعلیم

Quaid-e-Awam University of Engineering, Science & Technology
بیچلرز, , Bachelors of Engineering‎
Thermodynamics
2009

پیشہ ورانہ مہارتیں

ماہر Cooordination Skills
ماہر Customer Interaction
ماہر Instruments Drawing
ماہر Project Implementation

زبانیں

متوسط سندھی
متوسط اردو
متوسط انگریزی