خلاصہ

To have the best hands on professional experience, I am looking forward to be a part of a team and offer my service to move parallel to company's goals. If given an opportunity to incorporate company's vision, I pledge to utilize my skills to the optimum and go beyond the lines of my capabilities, constantly exploring my strengths to deliver the best results & eventually will be contribute organization's growth.

پراجیکٹس

Construction of Phase 3 at YKK Factory Karachi
Extension of Children Hospital, PIMS Islamabad

تجربہ

کمپنی کا لوگو
Mechanical Engineer
Pect Pvt Ltd Islamabad
نومبر ۲۰۲۰ - جولائی ۲۰۲۳ | Islamabad, Pakistan

• Manage MEP designs and implementation, including HVAC, pumping, Fire Fighting, Gas lines and piping systems from initiation through successful closure for new projects.• Consult on HVAC system and equipment design for a wide range of projects, and work with other engineers, project managers, and construction professionals as needed to create and/or modify design parameters.• Ensure that the installation, inspection and testing of all the MEP equipment, fittings and work implemented meets the specification, regulatory and other requirements.• Study tender documents including drawings, project specification, BOQ, scope of work, contract details and conditions.• Responsible for providing complete quantity take-off, analysis, estimate, and studies for all deliverables involved in the assigned scope.• Collect all Equipment's Technical Data sheet/Specifications from vendors, drawings and compile in line with tender documents to prepare technical submittals.

کمپنی کا لوگو
Technical Sales Engineer
Al Rabeh Heavy Equipment & Spare Parts UAE + OMAN
اکتوبر ۲۰۱۸ - ستمبر ۲۰۲۰ | Sharjah, United Arab Emirates

Assist sales team in executing and achieving their territory and market business plansResolve internal and external technical support requests or issues related to product selection, application, specification and installation.Commercial processes for quotation, receipt of order, order entry, shipment and delivery of order, and resolution of return requests and quality issues.Prepare Equipment Technical Specifications / Material Requisitions, such as MechanicalSpecification and Mechanical Data Sheet.Develop, communicate, enforce and monitor effective Parts Department processes to ensureinternal and external customer satisfaction.Provided professional written and verbal communications and timely processing of quotationsand orders.Assist in stock control by proactively request items to ensure the availability of properinventory levels to fill a customer's needs.

کمپنی کا لوگو
Mechanical Site Engineer
Vertex Medical Pvt Ltd Lahore
اگست ۲۰۱٦ - جولائی ۲۰۱۸ | Lahore, Pakistan

Conduct research into the feasibility, design, operation and performance of mechanisms, components and systems.
Installs new Heating and Air Conditioning systems and related accessories according to company, safety, and manufacturer's specifications.
Plan and manage projects, prepare material, cost timing estimates, reports and design specifications for machinery and systems.
Supervise and inspect the installation, modification and commissioning of mechanical systems at construction sites.
Investigate mechanical failures or unexpected maintenance problems.
Prepare contract documents and evaluate tenders for installations & maintenance.
Supervise technicians, technologists and other engineers and review approved designs,calculations and cost estimates.

کمپنی کا لوگو
Internee Mechanical Engineer
Thermal Power Statation
جولائی ۲۰۱۵ - ستمبر ۲۰۱۵ | Muzaffargarh, Pakistan

I was placed at Unit 4 and 5. These units were built by China known as Phase 2. They have the capacity to generate 210 MW. I have worked in many areas in the Power Station. Following are the sites, where I have been performing duties, along with description.
-Water Tube Boiler : Different Parts; Superheater, Evaporator, Boiler Drum, Down Comers, Reheaters, Safety Valves, Furnace, Soot Blower and Calorifier
-Steam Turbine: High, Intermediate and Low Pressure turbine and the water cycle.
Duties
-Checking the vibrations at thrust and Journal Bearings on the turbine rotor
-Check the repairing of bearings
-Analyse the different cycles running in the Plant such as Steam Cycle, Oil Cycle

تعلیم

Bahria University
ماسٹرز, ماسٹرز ان سائنس, MS Project Management‎
Project Management
CGPA 3.61/4
2023
Mohammad Ali Jinnah University
بیچلرز, بیچلرز ان سائنس, BS Mechanical Engineering‎
Mechanical Engineering
2016
Government college of technology Bahawalpur
ڈپلوما, DAE Mechanical‎
Mechanical Engineering
مکمل
2011
BISE Bahawalpur
میٹرک / او لیول, سائنس, Matriculation‎
Science
فی صد %
2008

پیشہ ورانہ مہارتیں

متوسط Hvac
متوسط PLUMBING
متوسط 3D Designing
ماہر Administrative Skills
متوسط Analytical Skills
ابتدائی Ansys
ماہر Audit Assignment Handling
ماہر Auditing Skills
ماہر AutoCAD
متوسط AutoCad Drawing
متوسط Automation Tools Knowledge
متوسط Automobile Knowlege
ماہر Bid Preparation
ماہر BOQ
ابتدائی Budgeting
متوسط Construction Administration
ماہر Construction Cost Control
ماہر Construction Management
ماہر Cooordination Skills
ماہر Cost Estimation
ماہر Costing Management
ابتدائی CREO Parametric
متوسط Data Analysis
ماہر Documents Maintenance Skills
ابتدائی Electrical
متوسط Estimation
متوسط Field Supervision
ماہر Highly Detail Oriented
متوسط HR Management
متوسط Interpersonal Leadership
ابتدائی Maintenance Management
ماہر Mechanical
متوسط Mechanical Skills
متوسط Mechanical Aptitude
متوسط Mechanical Design
ماہر Mechanical Drawings
متوسط Mechanical Handling
متوسط Mechanical Inspection
متوسط Mechanical Product Designs
متوسط Mechanical Troubleshooting
متوسط MEP
ماہر MEP Coordination
متوسط MEP System
ماہر Microsoft Powre Point
ابتدائی Microsoft Visual Studio C++
ماہر Monitoring Skills
ماہر MS Excel
ماہر MS Office
ماہر MS Project
ماہر Multitasking Skills

زبانیں

ماہر پنجابی
ماہر اردو
ماہر انگریزی