An Electrical engineer having 8 years of a Diverse experience focusing on Construction field, Signage Lighting, Maintenance Planning and Implementation of Plant Machineries & Utilities, Renewable Energy, Electrical Power Distribution and Generation field.
· Overseeing and managing the site labor force and sub-contractors
· Checking plans, quantities, and drawings to ensure accuracy
· To check plans, drawings, and quantities for accuracy of calculations and implemented at the site.
· To manage construction schedules related to electrical elements of job sites
Maintained all the plant machinery in excellent condition through Monthly and Annually Preventive Maintenance.
Validated the Technical Information corresponding with Specifications and Shop Drawings (SHD) checking plans, drawings, and quantities for accuracy of calculations and implemented at the site.
Approved Electrical Shop Drawings as per site conditions and discussed with the team and inspected with the Consultants
Achievement:
 Controlled Supplier quotation by 50% after correct analysis of the machine fault and rectified the machine within 8 Man-hours.
Proficiently installed all the final devices as per the requirements.
Coordinated with Electrical Contractor for Electrification, Execution, Erection & Commissioning of each circuit, finally fixed the equipment as per IFC drawing.
Effectively connected all the panels like SMDB, DB, and FDB panel according to the approved load schedule and passed the site inspection without any comments.
As an E&I Engineer the Responsibilities and Achievements at
Shuqaiq Steam Power Plant (SSPP-2800 MW) Stage-1 are:
• Assist for detailed T&C schedule development.
• Prepare/supervise preparation of test packs
• Establish joint verification/validation inspection with Client team
• Submit T&C reports for obtaining Client approval
• Establish T&C logs for all works - Coordinate subcontractor T&C activities
• Compile commissioning test data, inspection reports, and certificates and include them in the systems manual and commissioning report.
• Coordinate with other project teams - Prepare commissioning reports
• Assemble final commissioning documentation, including the commissioning report and Project Record Documents;
• Monitor construction progress and identify areas for commissioning readiness;
• Evaluate performance deficiencies identified in test reports and, in collaboration with entity responsible for system and equipment installation, recommend and perform corrective action.
• Collaborate with installation teams (Electrical and Auto-Control) to assure HVAC equipment are ready for commissioning
• Schedule, coordinate, witness, and document commissioning tests, inspections, and operations
• Confirm all required parameters to normally operate HVAC equipment are being met during testing.
• Basic Troubleshooting of Fans & Motors in Motor Control Center (MCC) and DCS Room.
• Basic troubleshooting of DCS Logic at CS3000 Yokogawa
• Review of control philosophy, P&I diagrams, cause & effect diagrams, instruments list, flow chart
• Installation, calibration and loop checking of the field instruments (Endress & Hauser, Bently Nevada, Honeywell, Yokogawa)
• Maintenance & calibration of transmitters PT, LT, TT, DPT (Rosemount, Yokogawa, Vega, Foxboro, Honeywell......)
• Maintenance and Calibration of flowmeters configuring (electromagnetic, orifice plate, ultrasonic, turbine, variable area ) of ABB, Rosemount
• Review/Execute T&C procedure
Achieved Data acquisition skills for Generators, Motor, Transformers, and Electricity Distribution System
Implemented the results of application tools like Ret Screen and Stats Graphics on the project site for site evaluation and feasibility of the project
· System Designed for standalone solar PV, Grid Connected/Hybrid Solar PV system sizing, and its economic viability keeping in mind customer budget to determine project viability in terms of economic factors.
Coordinated and consulted with System Design, Installation Service Providers & Site Concerns for project execution to finish the project on time
- Diagnose Malfunctioning system equipment and solar photovoltaic electrical system via test equipment to identify the cause of breakdown; fix the problem and connect the wires to circuit breakers, transformer, and other equipment within designated schedule.