Electrical Technologist with 8+ years of experience working in the Electrical industry. Primarily focused on implementation of digital systems. Enjoys being part of a team, as well as managing, motivating and training a productive team, and thrives in high pressure and challenging working environments.
Enter Description
Currently have been working as "Supervisor’’ Facility & Maintenance Engineering Department at Evercare Hospital Lahore. • Supervised routine planned and reactive breakdown Mechanical, Instrument and Electrical work including inspections, PM's, over-hauls and repairs. • Inspect facilities periodically to determine problems and necessary maintenance. • Prepare weekly maintenance schedules and allocate work. • Inspect and maintain building systems (heating, ventilation etc.) • Contribute to the development of maintenance budget and ensure compliance. • Monitor inventory of materials and equipment. • Participate in coordination of projects (e.g. renovations). • Ensure adherence to quality standards and health and safety regulations. • Operation & Maintenance (Shift Handling & Trouble Shooting)
I worked as "Assistant Team Leader" Maintenance and utility Department at
FOTON JW Auto Park Pvt, Raiwind Lahore.
Job Responsibilities:
Responsible for the project management of all electrical Installations.
Completed multiple tasks on time and under budget.
Plan layout and installation of electrical wiring, equipment and fixtures, based on job
specifications and local codes.
Worked on chain conveyor.
Worked on hoist crane weekly and monthly maintenance.
JW-Forland automobile in this project I have done the installation work with chines team, while
some of these are given below.
Erection of Assembly line, testing line, paint plant, and weld shop.
GI Cable tray installation (Leader type
Electrical Power Cable laying and termination 6mm to 300mm.
Installation/Execution of LV panels and Earthing.
Installation/Execution of lighting and ventilation cooling system
I worked as ‘’Substation Technician’’ with HCMS (Schneider Electric Pakistan)
at Emporium Mall by NISHAT Properties. 01-02-2017 to 20-05-2018
Job Responsibilities:
I was dealing with client (NISHAT) as a Shift Technician from Schneider. We were taking care
of Operation and Maintenance of all Substations.
Schematic, As Built drawing understanding & Execution.
Maintenance dry & oil type transformer 2500kva.
Installation of Lights including Emergency lights according to the designed drawing.
VCB (630A, 11KV), ACB up to 2500A (Master pact NW).
Worked on Schneider Electric Relay’s (Micom P 122, P 341 & P 115).
Worked on MV (RK &PIX) & LV (Blok set) Panels.
Installation of BTD (Bus Trunking Duct) 220 to 440V.
Installation of CT & PT of LV and MV according to the given control scheme diagram.
LV and MV Panels including Energy Analyzer P10, TCU (Temperature Control Unit), Indication
Lights, Selector Switch, Analog Ammeter & Voltmeter cabling according to the designed
drawing.
EMS & BMS system operating & maintenance.
PFI (Power Factor Improvement) Panels.
MCC Motor Control Centre 1.5 KW to 75KW pumps.
Meggering of Electrical Induction Motors.
I worked as ‘’Technician’’ with HCMS (Schneider Electric Pakistan) in Services
depart Lahore office.
Job Responsibilities:
Electrical Drawing and SLD’s (Single Line Diagram).
Installation and testing energy meter and energy analyzer.
LV, MV Switchgear and Distribution Boards.
RMU, Ring Main Unit.
Cables laying, dressing, tagging and termination.
HT / LT system and line instruments.
VCB, ACB, MCCB, and MCB Breaker maintenance and control system.
Testing of LT & HT, Hi-Pot Test, Earth Test, Current Injecting Test, Dielectric Test,
Insulation Resistance Test and Continuity Test.