Projects
Synchronization Project ( Comap Module ) Synchronizes Gas Genset With Diesel Genset and both are synchronizing with 132 KV Energy Source (Wapda).
HVAC System of Power Plant Cooling Tower Installation .
Installation Working of Power Plant Cooling Tower
EXPERIENCE
1st December 2011 Present Sapphire Finishing Mills. (Power Generation )
Plant Capacity 18MW
Plant Detail Jenbacher JGS320 (1MW)5
Cater Pillar 3512 (1MW)3
Cater Pillar 3516 (1.6 MW) 2
Wapda (132Kv) (8 MW)
As A SHIFT INCHARG
Trouble Shooting of Generator
The Schedule and unscheduled Maintenance
Maintenance of Engine 1000 hr 2000 hr
Synchronization with other Source
Work on Air Circuit Breaker, Bus Bar, Feeder Panel, And Auxiliary Control Panel.
Work at low and high Voltage Power Cable, Power Transformer
Maintain update the record of daily operation progress as well as document the section as per routine.
Maintenance of Different Types pumps and motors
Prepare daily and monthly consumption report.
Experience of operation on 500 KW Low pressure steam turbine.
Worked on Parallel operation of Jenbacher Gas Cater pillar Diesel Engines to Wapda (132 kv)
TEAM LEADER OPERATION AND MAINTENANCE IN POWER HOUSE.MANAGEMENTAs A SHIFT INCHARG Trouble Shooting of Generator The Schedule and unscheduled Maintenance of Engine 1000 hr 2000 hr Synchronization with other SourceWork on Air Circuit Breaker, Bus Bar, Feeder Panel, And Auxiliary Control Panel.Work at low and high Voltage Power Cable, Power TransformerMaintain & update the record of daily operation progress as well as document the section as per routine. Maintenance of Different Types pumps and motors Prepare daily and monthly consumption report.Experience of operation on 500 KW Low pressure steam turbine. Worked on Parallel operation of Jenbacher Gas & Cater pillar Diesel Engines to Wapda (132 kv)