Led a team of professionals in executing project.Developing a Project Kohistan Greens at Wah Cant Gt Road 1800 Kanal Area A Project Of Kohistan Builders and Developer's Underground Ht /Lt Duct Lines, Water supply, O. Head Water Tank Sewerage, Spt, drainage system & Infrastructure Work With all respects.
Infrastructure Development Works of DHA Multan Sector H. Project Consist of Construction of Grand Mosque, Overhead & Underground Water Tanks, Water Supply and Sewerage lines, Strom Water Drains, asphaltic roads Box Culverts, Footpaths, Cunetteand & Earth work subgrade, Improved Subgrade, Subbase, Base etc.
Development of ASF City M-9 Karachi.Major components of the Project include Construction of Main Boulevard Commercial Block Storm Water Drains, RCC Culverts, RCC & Brick Masonry Retaining Walls etc.Construction Of (Thermal Power Station Jamshoro 2660MW) & Sewage treatment Plants.
Project Including Office Buildings, Administration Block 3 Stories For Main Power House Residential Blocks (150 Houses) 3 Nos Of Septic Tanks ( Capacity 174000 Gallons Each ) Equipment Rooms, Operating Buildings, RCC Sewer Lines, water Supply, Boundary Walls.
Construction Of CPEC (Peshawar Karachi Motorway PKM Sec07/60KM) Project Including 15 Underpasses¸ 13 Bridges, 14 Subways , Road Culverts, Cattle Creeps. Major works include Cast in Situ Piles dia (1.2m), Precast & Pre stressed Girders, Storm Water Drains, RCC Box Culvert, pipe Culverts, Cattle Creeps, RCC Retaining Walls, Protective Walls, Asphaltic Base Course & Asphaltic Wearing Course ,Toll Plaza And Service Area Rest Area Buildings etc.
Construction of Ring Road SL-02 Including 04 Underpasses¸08 Bridges, Subways, Road Culverts. Major works include Cast in Situ Piles dia (1.2m), Precast & Pre stressed Girders, Storm Water Drains, RCC Box Culvert, RCC Retaining Walls, Water Bound Macadam, Asphaltic Base Course & Asphaltic Wearing Course etc.
i: Construction, Widening & Improvement of Sharqpur Road & Main Shaikhupura Road Including 02 Underpasses. Major components of the Project include Cast in Situ Piles dia (0.75m), Pile Caps, Precast & Pre stressed Girders, Storm Water Drains, RCC Box Culvert, RCC Retaining Walls, Water Bound Macadam, Asphaltic Base Course & Asphaltic Wearing Course etc.
II: Construction Of Defence Community Club (DCC) , Finishing of Defence Raya and Golf Community Club (DRGCC) Phase# (5,6,9) Lahore .Including 4 Residential Blocks, SOG, Brick Masonry, RCC Columns, International Standard Squash Hall ,Tanis Hall, Basement, Generator Room, Rcc Ramps, Car ParkingÃâs, MenÃâs/Ladies Swimming Pools, Restaurants, Storm Water Drains, RCC Retaining Walls.
Development of Engineering Cooperative Housing Society Islamabad. Major components of the Project include Construction of Primary School, Jamia Mosque, Storm Water Drains, RCC Culverts, RCC & Brick Masonry Retaining Walls etc.
Construction of Flyovers at Chandni Chowk & 6th Road Junctions along Murree Road, Rawalpindi. Length of Chandni Chowk Flyover was 403m and that of Sixth Road Flyover was 248m. Major components of the Project include Cast in Situ Piles dia (1.2m), Pile Caps, Precast & Pre stressed Girders, Storm Water Drains, RCC Box Culvert, RCC Retaining Walls, Water Bound Macadam, Asphaltic Base Course & Asphaltic Wearing Course etc.
Infrastructure Development Works of Naval OfficerÂs Housing Colony, Zone-5,Islamabad. Project Consist of Construction of Grand Mosque, Overhead & Underground Water Tanks, Water Supply and Sewerage lines, Strom Water Drains, Box Culverts, Footpaths, Cunetteand Roads etc.