MUNEEB QURESHI is an experienced Civil Engineer graduated from one of the renowned university of Pakistan with 09 years of professional experience and have worked on multi-million dollar projects of roads and highways, bridges, multi-storey buildings, hospitality, infrastructure, barrages, dams & hydropower projects in national and international consortium with top consultancy organizations like M/s NESPAK, ACE, EGC, Barqaab, TEAM, CA & Hashoo Group of Pakistan, M/s BBV and MWH Global Inc. of USA, M/s Mott MacDonald and IMC Worldwide of UK, M/s Coyne et Bellier (COB) of France, M/s Multiconsult or NORPLAN of Norway coupled with Projects with UWA, Curtin University of Technology and Sydney Trains.
His technical expertise are as under:
Coordinate internal resources and third parties/ vendors
On-time and budgetary delivery of all contracts/ sub-contracts
Conflict-resolution
Trouble-shooting to the raised issues/ site bottlenecks
Stakeholders management
Technical feasibility and allocation of available resource
Develop and track project plan
Participation in design/ progress review meetings’
Establishing and maintaining relationships with third parties/ vendors
Creating and maintaining comprehensive project documentation
Preparation/ vetting of detailed drawings and their revisions
Preparation of Project maintenance plan.
MUNEEB QURESHI AND HIS TEAM ALSO AVAILABLE FOR SHORT-TERM, CONSULTING, THIRD PARTY VALIDATION, ARCHITECTURAL & STRUCTURAL DESIGNING, PROJECT MANAGEMENT, CONTRACT MANAGEMENT COST ESTIMATION ASSIGNMENTS. FOR BUSINESS ENQUIRIES, CONTACT AT: mmconsultingengineers@yahoo.com
Determine the type and status of the required activity, create, prioritise and maintain a schedule of work to manage TMP development/ modification within the agreed timeframe. Formally report progress on a weekly basis, organise and facilitate technical workshops with stakeholders, manage outcomes by following the Sydney Trains Maintenance Requirements Analysis methodology, draft proposed changes and supporting documents to Sydney Trains standards and review with Stakeholders, obtain approval for release, and manage the publication and distribution process.
Responsible to coordinate internal resources and third parties/vendors for the flawless execution of project, on-time within scope and budgetary delivery of all contracts/ sub-contracts involving all relevant stakeholders in loop, ensuring technical feasibility, ensuring resource availability and allocation, developing a detailed project plan to track progress, using appropriate verification techniques to manage changes in project scope, schedule and costs, measure project performance using appropriate systems, tools and techniques, report and escalate to management as needed, managing the relationship with the client and all stakeholders, perform risk management to minimize project risks and establishing and maintaining relationships with third parties/vendors coupled with creating and maintaining comprehensive project documentation along with mentoring of Project staff as and when required.
I am part of the Management team, responsible for the establishment of a successful and competitive District delivery team. Work closely with the Program team and ensure all the operational needs of the program are efficiently provided. Responsible for financial management, team building, administration of the program, procurement / contracts, optimization of resources and supporting / enabling the program team to deliver the project.
Responsible for review of structural design of various project components (such as dam, headrace tunnel, penstock, power station, transformer hall), design calculations and drawings including shop drawings submitted by the Contractor, supervise and guide Cadman’s drafting including digitization of drawings, participation of design review meeting’s with expatriate expert’s, Client and Contractor.
Responsibilities include development/ digitization of undergraduate course lectures on the Analysis and Design of Reinforced Concrete beams. This includes the printing of lecture notes and tutorials and development of solved example notes for class exercises and coupled with providing support in research on concrete containing nanoparticles.
Responsible for ensuring technical understanding of lectures delivered by experts, questions to lecturers and answers to course participants including help/ guidance at an individual level to understand lectures and in filling proformas, learning diaries, assessment and reflection sheets etc.
Responsible for review of previous hydrological, climatological and meteorological studies, review of previous design and revised it based on the post flood conditions and recent soil investigation studies, development of comparison sheets, design calculations, hydraulic drawings, preparation of reports.
As a Senior Engineer (Structures), responsible for calculation of design forces, model, analysis and design of structural elements of various project components, assist Expatiate Design Team Leader/ Chief Structures in preparation of design criteria/ working notes and development of Construction drawings.
As a Project/ Hydraulics Engineer, responsible for hydraulic designing of various project components, compilation and printing of Civil Work’s drawings and onward circulation to experts, assist DPM/ CE (Hydraulics) in finalizing layout planning, participated in Progress/ Design Review Meeting’s along with presentations with Client and experts, supervise junior’s work and guiding draftees, preparation of technical memorandum/ report’s, assist PM in routine correspondence and coordination with Client, team and expert’s in consort with man-month’s and financial monitoring of the project.
As a Junior Project Engineer, take part in design/ progress review meetings with experts, assist Chief Engineer (Structures) in preparation of technical specifications for Concrete and preparation of tender drawings, Contract Specialist in updating of Employer’s Requirement, Project Engineer in updating and submission of Bidding Documents, BOQ and Cost Estimates to Client, supervise and guide draftees including digitization of FS Drawings.
As Junior Engineer (Office), assist CE (Structures) in Design Review of Contractors’ submittals, review of design calculations and drawings submitted by EPC Contractor, correspond with experts and Site Staff in preparation of responses’ to queries, participated in the inspection visit/ meetings with Client/ expert’s, preparation of comments, design sheets, supervise and guiding draftees, reports, monthly invoices together with determining distribution of JV partner’s share, checking of Contractors’ work done quantities, variation orders’, IPC’s, correspondence and coordination with Client/ Contractor.
As an Assistant Design Engineer, involved in review of codes and specifications for selection of design parameters, responsible for structural designing of schools (Single and Double Storey) using SAP2000 & other computer aided tools along with drafting of drawings, compilation and printing of structural drawing’s for onward submission to the Client, supervise and guide draftees, assist Director (Technical) in proof reading of the drawings and Senior Design Engineer (SDE) for mentoring of new comers/ juniors.
As an Assistant Design Engineer, involved in Review of codes and specifications for selection of design parameters, responsible for Structural Designing of apartments (10 Storey) using ETABS 9.5 & other computer aided tools along with drafting of drawings, compilation and final printing of structural drawing’s for onward submission to the Client, supervise and guide draftees, assist Director (Technical) in foundation design using SAFE and in proof reading of the drawings.
As Cost/ Office Engineer, act as Team Leader of 6 group members for finalizing CSR in the light of Client comments and final printing of CSR-2011, participated in the meeting held at Office with Deputy Director (NHA) for finalizing CSR, responsible for processing of all data collected from all Pakistan into their respective, assist Director (Technical) in preparation of comparison graphs and presentations to show their effects with 3M’s (Material, Manpower and Machinery) and Managing Director (MD) in finalizing favourable routes to each quarry and materials classification.
Additional Tasks as a Quantity Engineer, responsible for Cost Estimation of PHA (04 Storey) C-Type Apartments in Islamabad, assist MD in preparation of variation orders, provided volunteer services in managing 23 years posterior NHA (CSR) office record.
Responsible for supervising all site activities with optimum utilisation of the team keep ensuring quality checks on Contractor’s work, preparation of linear plans, cross-sections, arrangement plan for future activities and including cost estimation, assist Quantity Surveyor (QS) in verification of Contractor IPC’s, groundwork for comparison reports and replies to Contractor letters, Material Engineer (ME) in verification of quality test results and preparation of reports.