B.Sc. Civil Engineering. CGPA 3.9/4
Institution University of Engineering Technology, Lahore. 2015 2019
Internship at Associated Consultant Engineers (ACE)
Intern July 2018- August 2018
Duration 1 month
Location Lahore, Pakistan
In Design office of Transportation division of ACE, following structural designs I learnt -
RCC building design on ETABS and SAFE
Retaining Wall design on QuickRWall 4.0
Basic design of bridge on CSiBridge 20
I also made excel sheets of RCC slab design, Continuous Beam design, Culvert design,
Masonry wall footing design and Gravity retaining wall design
Internship at NATIONAL ENGINEERING SERVICES PAKISTAN (NESPAK)
Intern June 2017- August 2017
Duration 2.5 months
Location Bahawalpur, Pakistan
Project Name Demolition and Reconstruction of Railway Station
Assisted quantity surveyor in making Bar Bending Schedule of slab and beams during execution of the project
Improved survey skills and helped surveyor in completing layout of building with Total Station
Physically supervised the following activities with RE at site-
Excavation using excavators
Compaction using rollers and excavation machines
Field Density Test (FDT) and termite spraying in excavation
Laying of 3 lean concrete (148) under footing
Batch mixing by volume using plant at site
Steel binding and concreting of beams, columns and slabs
Internship at Associated Consultant Engineers (ACE)
Intern: July 2018- August 2018
Duration: 1 month
Location: Lahore, Pakistan
In Design office of Transportation division of ACE, following structural designs I learnt :-
▪ RCC building design on ETABS and SAFE
▪ Retaining Wall design on QuickRWall 4.0
▪ Basic design of bridge on CSiBridge 20
I also made excel sheets of RCC slab design, Continuous Beam design, Culvert design,
Masonry wall & footing design and Gravity retaining wall design
Internship at NATIONAL ENGINEERING SERVICES PAKISTAN (NESPAK)
Intern: June 2017- August 2017
Duration: 2.5 months
Location: Bahawalpur, Pakistan
Project Name: Demolition and Reconstruction of Railway Station
▪ Assisted quantity surveyor in making Bar Bending Schedule of slab and beams during execution of the project
▪ Improved survey skills and helped surveyor in completing layout of building with Total Station
Physically supervised the following activities with RE at site:-
▪ Excavation using excavators
▪ Compaction using rollers and excavation machines
▪ Field Density Test (FDT) and termite spraying in excavation
▪ Laying of 3” lean concrete (1:4:8) under footing
▪ Batch mixing by volume using plant at site
▪ Steel binding and concreting of beams, columns and slabs