With a bachelor’s degree in Electrical Engineering Technology and more than seven-year field experience with electrical distribution systems and MEP works, my goal is to find a full-time electrical engineer position and continue to provide electrical engineering services in Construction and industrial environments
• Mechanical-Electrical-Plumbing Project Engineer.
• Responsible for reviewing master project schedule and budgets and Quality Control.
• Responsible for coordinating all subcontractors and many projects simultaneously.
• Communicate subcontractor conflicts to A/E design team and make recommendations to solve their problems in most efficient and cost-effective manner
• Ensuring completion of all tasks related to commissioning of building management system
• Managing the demands of meeting a tight schedule by positioning trades in the right spot at the right time.
• Worked for Bin delamah Contracting Company, Dammam, Saudi Arabia.
• Covering SEC (Saudi Electricity Company) projects including:
• Installation of CCTV Cameras in Substations for Nariyah Project.
• Planning and scheduling of day to day work on site and conduct meetings with clients.
• Lead the Team of Site Engineers, foremen and Technicians for Underground cable laying (3x300, 4x300, and 4 x 70, 4 x 25 mm2).
• Coordinated with Saudi Aramco to receive work permits in Aramco areas by fulfilling all safety requirements and personally revised company’s safety standards.
• Arranged permissions from Baladiya, Road department, Mobily and Ministry of water
• Designed and installed new substations of SEC (Transformers, RMUs, Minipillars), designed cable route, substation positions, transformer types and panels for Road Department including sizes of poles and lights suitable for given conditions.
• Installed new 13.8 kV underground and overhead feeders and did testing of equipment.
• Worked as Site Electrical engineer in ECM (Engineering and construction management Pakistan PVT limited).
• Headed the team of technician for the installation of CCTV cameras.
• Scheduling of Electrical Works and preparation of technical reports
• Headed a team of technicians and foremen for the villa wiring work.
• Coordinated with consultant and the local authorities for Submittals
• Testing and commission of distribution network inside FDA