To obtain a challenging job in growing organization where I can use and enhance my knowledge and skills through actual application and practices.
• Responsible for Supervision of Ericsson 2G/3G/4G swap site to Huawei solution including transmission, wireless and power.
• Wireless equipment’s like RRU 3959, 3953, 3826 and power cube ICC500 installation.
• Installation of new and existing sites of 2G & 3G with DBS3900 technology.
• Site visibility and integration of 3900 and 3910 sites.
• Site expansion/ sector addition to improve coverage area.
• CoMPT Technology to convert GRFU mode site to RRU mode.
• Configuration, testing of external environmental alarms and pre-defined installation standards.
• Site troubleshooting like VSWR, RTWP, RET, sector swap, ALD and KPI issues.
• Responsible of HO sites to Customer (Mobilink).
• Getting updates from Subcontractor and sending daily reports to Head office.
Responsibilities: Worked at Huawei 4G4 and U900 project in central region Saudi Arabia.
• Coordination with POC & vendor site engineer.
• Confirmation of material according to SAF and closing CIAG on site.
• Make surety of team EHS on site.
• Implementation of LTE2100 by RRU3839 & UBBPd4 card.
• Implementation of LTE1800 by RRU3959 & UBBPd4 card.
• Installation of U900 sites.
• Uploading the script for LTE2100 and 1800 visibility of UMPT, UBBP and UPEU card via LMT and WDT.
• 4G4 U900 Technology survey.
• TSSR (BSS) sharing with POC to provide actual on site running Parameter like, site type, coordinates, Antenna Heights, azimuth, Electrical and Mechanical Tilt etc.
• Implementation of Antenna, TMA and RCU for efficiency of network.
• Worked on a troubleshooting like VSWR, RTWP, RET, sector swap, RF unit maintenance link failure, ALD etc.
• Responsible for HO of sites to customer (STC) with locked standard
Responsibilities: Worked on Motorola swap and 3G Huawei project.
• RTN 900 series link1+0, 1+1 installation and commissioning according to the link Budget plan
• 2G MW, BSS and power swap from Motorola to Huawei equipment
• Media shifting from NEC to RTN.
• Indoor3900 and outdoor 3900A BTS installation.
• Implementation of DBS sites of IBS project.
• New RF antennas installation and expansion sites.
• Power cubes (ICC300, ICC500, and ICC900) installation.
• Alarm verification on Net Eco and U2000.
• 3G survey and TSSR (BSS, and Power) to provide actual on site running Parameter like, , site coordinates, Antenna Heights, azimuth, Electrical and Mechanical Tilt, Panoramic, Power system capacity and power banks etc.
• Implementation of 3G by RRU 3829, WMPT and WBBP cards.
• Cast efficient solution survey and its implementation.
• Roll out site implementation.
• Worked on a troubleshooting like VSWR, RTWP and TMA RET, sector swap.
• Responsible for HO of site to customer (Mobilink and CMPak).
One year internship in 184MW Chashma Hydel power station on following section.
Operation section:
• Kaplan Type Turbine.
• Main Parts of TURBINE.
Electrical Section:
• Electrical Generator.
• Transformer.
• Synchronous Generator.
Mechanical Section:
• Governor and Its Operation.
• Governor parts.
• Types of Faults in Governor.
Protection and Instrumentation section:
• Transformer.
• Automatic Voltage Regulator (AVR).
• Relays.
• Transducers.
• Circuit Breakers.