Trainee Engineer at Haroon Brothers worked as a site engineer at 500KWp ON Grid solar power plant at sapphire textile mill.Small residenntial solar projects and Net metring at DHA lahore.Calibration of weighbridges at ATLAS power plant and Bestway Cement.
o Preparation of bid documents for 1.3 Mw grid tied solar system. o Preparation of bid documents for battery bank at substation
o 500 kwp grid tie solar at Sapphire Textile Mill Feroze Wattwan.
o 15 kwp residential grid tie solar at DHA.
o 10 kwp residential grid tie solar at DHA.
o 5 kwp residential grid tie solar at ASKARI X.
o Troubleshooting of 25 kwp at AL-Asad hotel Lahore.
o Calibration of Weigh Bridge at Atlas power plant.
o Calibration of Weigh Bridges at Bestway Cement Kalar Kahar and Chakwal.
o Calibration of Weigh Bridge at Wali Oil Mil