Abdul Manan Nizamani i have done M.E- in Electrical power system from GSESIT-Hamdard University city camps Karachi in 2016 before that i did B.E-Electrical from Mehran UET, during my BE i have working as internee different power sector like TPS-jamshoro, HESCO, PIA, Ansari sugar mill after my study complete, i did joint CEMEC Engineering (Pvt) Ltd in July-2010 Site Engineer after complete difference Project, I did joint couple of company during (fed-2012 to dec-2012) Asia Engineering as Safety Engineer in oil and gas sector, SSJDC-group as Shift engineer, in jan-2013 i did joint KESC its power utilities in Karachi then 2014 KESC convert into K-Electric (2013-april-2016) working as Assistant Manager in Distribution side , currently working as Manager HSE in Asia Engineering in oil and gas sector
Load Balancing, Load alteration/division and power factor improvement
Transformers and L.T Circuit maintenance (re-sagging, cleaning and proper earthing)
Design new SIPs (System improvement proposals) to reduce line losses, transformer over loading & load shedding
Daily, Weekly mains maintenance & Testing work reports
Route Mapping of new consumers on different PMT’s for power improvement and balancing
Complete Projects according to SOPs & create new SOPs.
SAP (ERP) Technical Faults reporting and managing
Maintenance, construction, testing and planning of upcoming & running projects
Supervision regarding rectification of underground cable faults. Here my key responsibility is to guide my subordinates regarding detection and isolation of underground cable faults.
Testing of all the parameters of high tension and low tension network (i-e, CT S1 and S2 terminals, I and V parameters, Bus bar parameters)
Testing of CTs & PTs
Screening for HT and LT Network from 40KW to 500KW and above.
Observation of technical losses from EHV/220KV grid to HT underground and LT network.
Assigning jobs for testing and jointing teams
Testing and rectification of underground cable faults
Ensure civil work and Maintenance is all done in accordance the safety procedures is compiled
Preventive/Corrective Maintenance of HT Network
Coordinating with KESC, Consultants & Concerned Authorities
Operation and maintenance of 132/6.3 KV Grid station and 6.3KV/440V sub-station.
Corrective and preventive maintenance of electrical instruments (switch-gears, circuit breakers, Transformers and motors)
Weekly preparing the Formats of Preventive Maintenance
Professionally committed to delivering high quality Safety Services to Labor and surroundings.
Assessing Risk by deeply concentration and Minimize the Hazard.
Provide essential training to employees relative with working Site.
Controlling and supervision working area .
Implementation of Safety Laws inside working Area
Preparing and issuing of Technical Query (TQ) for rectification if the work is non conformance as per Project Requirements
Coordinate with project team to review the project planning and adjust align in line with base schedule, where required.
Coordinate with project team to review the project planning and adjust align in line with base schedule, where required.
Submit Daily progress reports to our Manager and Client.
Ensure Project Execution is all done in accordance the Safety procedures is compiledReview & prepare Dossiers submitted to Project completion on timely manner